• Radio spectrum auction ultimately yields more than 1.4 billion euro

    Publications › Press release -
    Brussels, 20 July 2022 – Today, the BIPT concluded the final phase of the radio spectrum auction. Following the conclusion of the first phase of the auction of the new 5G spectrum (700 MHz, 3600 MHz) and the existing 2G and 3G radio spectrum (900 MHz, 1800 MHz, 2100 MHz) on 20 June 2022 producing 1.2 billion euro, the BIPT has now also concluded the second and final phase of the auction (1400 MHz radio frequency band). In this frequency band another 90 MHz was auctioned. This auction yielded 216.540.000 euro bringing the total amount for the two auction phases to 1.418.732.400 euro.
  • Affordability of the fixed telecom services within the framework of the provision of the universal service

    Publications › Other -
    Affordability and accessibility of fixed services (internet and telephone) for low-income persons
  • Call for projects - 5G pilots

    News -
    The FPS Economy, assisted by the BIPT, launches a call for 5G pilot projects to encourage the creation of new initiatives.
  • Public inquiry regarding sustainable collection and delivery

    Publications › Consultation -
    This inquiry is part of a study on the postal aspects of e-commerce the BIPT launched in May 2022, which also examines the environmental aspects of the first and the last mile.
  • Frequency plan

    Pages
    BIPT is in charge of: managing the radio frequency spectrum; examining requests for use of radio frequency spectrum, with the exception of requests destined for radio and television broadcasting; coordinating the radio frequencies, both on national and on international level; monitoring the use of spectrum.
  • ERGP press release - 22th plenary meeting

    News -
    ERGP press release
  • Communication on the Report on net neutrality monitoring in Belgium (period from 1 May 2021 - 30 April 2022)

    Publications › Study -
    Concerning the period from 1 May 2021 - 30 April 2022, the BIPT described all activities it carried out in the field of net neutrality and adopted the Report contained in the Annex.
  • Net neutrality

    Pages
    Net neutrality refers to a set of rules aiming at ensuring equal treatment of the information flow on the internet.
  • Construction of infrastructure

    Pages
    For the roll-out of his network, an operator is entitled to use, among other things, the façades that give out onto the public road. Prior to carrying out such works on private property, the operator has to try to obtain an ‘agreement’ with the owner in question.
  • Complaints concerning network roll-out

    Publications › Other -
    Rights to install telecommunications networks; how the administrative procedure proceeds before BIPT in case of a complaint
Back to top